Profit Profiles
D&S substantially reduces part cost and lead time
|
Company:
|
Original Equipment Manufacturer
|
|
Objective:
|
Reduce piece part cost and lead time.
|
|
Situation:
|
The customers design for the part consisted of four separate components and required multiple operations, including sawing, laser cutting, welding and machining.
|
|
Solution:
|
Without sacrificing quality or functionality, D&S personnel redesigned the part so that it could be made from a single piece of bar stock and two pins. This reduced the number of machining and welding operations from 7 to 3.
|
|
Bottom Line:
|
The price per part was reduced by 54%, which resulted in an annual savings to the customer of more than $30,000. The lead time for the part was cut from 13 days to 3 days.
Benefits to the customer include decreased part cost, lower inventory, a shorter planning horizon and improved production flexibility.
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
© Copyright D&S Manufacturing® . All rights reserved.
This text may be reproduced in electronic media if it remains completely intact and includes this notice.
Hard copy reproduction requires the written permission of Copyright D&S Manufacturing.
HOME > THE COMPANY > EQUIPMENT & PROCESSES > QUALITY STANDARDS
PRODUCTS > CAREERS > CONTACT > WHAT'S NEW